Lake Chelan Power Tunnel Isolation System

Location: Washington

Posted Date: January 27, 2025

Expiration Date: February 4, 2025

State: WA

Description: Fabrication and installation of a 16 ft x 16 ft steel drop gate assembly on the power tunnel inlet at Lake Chelan Dam. Appurtenant work components will include the gate hoist structure, a 50-ton electrically driven cable hoist, inlet bulkhead slot modifications, air vent pipes, refill valves, a 125KW/156KVA liquid propane generator, concrete foundation slab, and retaining wall. Underwater and over-water work will be required.

Location: Chelan County PUD, WA