Description Work generally includes installation of a temporary bypass pipe from the pump station to the north end of the project; replacement of the twin 36-inch diameter steel forcemains with 42-inch ductile iron pipe; construction of an odor control facility (OCF) and access road at the forcemain discharge structure (FMDS); and rehabilitation of the twin 48-inch forcemains, the forcemain discharge structure, and the Elliott Bay Interceptor Section 8 (EBI 8) from the forcemain discharge structure to the maintenance hole located near the north side of the golf course.