BIDS & RPFs

We Get Things Done
You are here:
Hcmud No. 418 Wastewater Treatment Plant No. 1 Expansion To 3 Mgd

HCMUD No. 418 Wastewater Treatment Plant No. 1 Expansion to 3 MGD

Location: Harris County

Posted Date: August 8, 2024

State: TX

Description: Contractor to furnish all materials, labor, and equipment for the expansion of the existing wastewater treatment facility expansion from 1.50 million gallons per day (MGD) to 3.00 MGD. Work includes but is not limited to the installation of one (1) rotating drum screen, two (2) reinforced concrete aeration basins, one (1) reinforced concrete clarifier basin, two (2) reinforced concrete digester basins, aeration diffuser equipment, relocation of one (1) existing disk filter, two (2) screw centrifugal sludge pumps, one (1) Siemens single stage tubro compressor, one (1) additional UV channel with three (3) vertical UV banks, site work, yard piping, drainage, site restoration, crushed concrete paving, electrical improvements related to Specification 16012, controls, and appurtenances; Complete in Place.

Location: Harris County, TX