State: OR
Description: Work shall include, but no necessarily be limited to: Demolition of existing infrastructure. Installation of bypass pumping system. Installation of mechanical equipment, piping, valves and components. Structural modifications to the existing wet well. Installation of proposed electrical equipment.
Location: Klamath Falls, OR
Estimated Cost: $1-1.2 million