State: WI
Description: 1. All Digger’s Hotline locates are the responsibility of the Contractor to complete before site work starts. 2. Erosion control shall be installed by the Contractor before work begins and removed by the Contractor once the work is completed. 3. Remove existing walls, step, sides and footings. All material and spoils shall be hauled away by the Contractor. 4. Cast in place 70 feet x 8-inch concrete wall with 2 returns into steps. 5. Steel reinforcement (3) #5 bar horizontal, #5 bar vertical, 2 feet on center. 6. 1-foot x 3-foot footing, steel reinforcements (3) #5 bar horizontal. 7. Chamfer all exposed concrete edges on wall. 8. Face of wall stamped stone pattern with 6 inch smooth border and coping. 9. Install 6 inch letters BENDER on one wall and BEACH on the other wall. 10. 8-foot x 11-foot concrete pad with 2 steps. 11. Contractor will try to the best of their ability to minimize turf damage. Once project is completed, the landscaping/turf damage will be repaired by the City. 12. Project completion timeframe: September/October
Location: Oconomowoc, WI