Posted Date: Febraury 16, 2024
Expiration Date: March 22, 2024
Province: MB
Description: Construction of a new 509,000 m 3 secondary lagoon cell, upgrades to existing lagoon cells, replace existing aeration systems in Cell 1, 2 and 3, sludge removal from Cell 1 including dewatering and landfill disposal (provisional item), site piping, two (2) 613 L/s vertical Submerged Attached Growth Reactors (SAGR) cells, SAGR influent lift station and effluent/recirculation lift station each rated at 613 L/s, associated forcemains, 560 m 2 pre-engineered Operations building, emergency genset, upgraded existing blower building for lagoon aeration, site/civil, structural, architectural, process mechanical, building mechanical, electrical instrumentation/controls and associated works.
Location: MB
Estimated Cost: $52,014,939.91