Posted Date: February 20, 2024
Expiration Date: February 28, 2024
State: WA
Description: The seismic retrofit of the Admiral Way Bridges includes the following general items of work: strengthening of steel column bents, new bracing at concrete pier bents, retrofit of bridge deck joints, bridge abutment retrofit, slope stabilization, strengthening with Carbon Fiber Reinforced Polymer (CFRP), and steel painting.
Location: Seattle, WA
Estimated Cost: $6.9-7.3 Million