Stiver Engineering prepared a caisson cutting edge design for a wastewater lift station replacement project in Redmond, Washington. In addition to the caisson cutting edge design, Stiver performed skin friction calculations for the pour heights and proposed wall thickness to check the safety factor for sinking.
Get Started Today!
Stiver Engineering Commitment
“We are driven by a passion for getting the job done. Every challenge presents an opportunity for innovation, and we embrace those challenges by engineering unique solutions that ensure our clients’ success.”
– JOHN STIVER
"*" indicates required fields
Or Call Us At
713-526-3478