Fort Bend County Pump Station Shoring
As part of a levee improvement project in Sugar Land, Texas, Stiver Engineering provided analysis and design for a three-sided shoring system with steel frames and timber lagging. The shoring…

As part of a levee improvement project in Sugar Land, Texas, Stiver Engineering provided analysis and design for a three-sided shoring system with steel frames and timber lagging. The shoring…

Stiver Engineering was retained to provide a contractor in Austin, Texas with a caisson design for the proposed Canyon Lake intake structure. The structure was designed to be 20 feet…

Stiver Engineering was retained by the client in Texas City, Texas to provide structural design through a caisson design and a 36-inch diameter force main design. The structure was built…

…Rock Tunnel Connector Pump Station Project included a screening and grit removal system consisting of 180 feet of 6 foot diameter connector tunnel, a subterranean pump room that is 60…

…in the downtown area. The pump station contained five vertical stormwater pumps, baffle walls, mechanical bar screens, generators, a discharge chamber, and a control building on the top slab of…