Winchester Bay Bore Project

Winchester Bay Bore Project

State: OR Description: Contractor will furnish labor and equipment to bore approximately 1,250 lineal feet of 3-2″ HDPE conduit located at Winchester Bay, Oregon. Contractor may also be required to install one three-phase switch stand, one concrete vault, one bumper post, two underground cable makers, and elbows to Central Lincoln specifications. Some locations will require…

Bid Southey Tunnel And Consolidation

Bid Southey Tunnel and Consolidation

State: OH Description: In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: * Approximately 18,060 LF of 23-ft (finished) diameter combined sewer overflow storage tunnel, excavated in soft ground and supported with a bolted, gasketed, one-pass steel fiber-reinforced precast concrete segmental lining. Four deep…