Search Results for: pump station

How Stiver Engineering Supports Pump and Lift Station Projects Across Houston and Beyond
…municipalities are turning to firms like Stiver Engineering to help design, support, and deliver the infrastructure that keeps these cities functioning—especially when it comes to pump stations and lift stations….

West Ashley Sewer Tunnel and Influent Pump Station
…an excavator and front-end loader on the wale set for access to the excavation and installation of the force main. The force main now connects the new lift station to…

Keegans Bayou Pump Station
Stiver Engineering was retained in Texas by the contractor to provide structural design by designing the caisson structure. We designed the caisson to be built above grade and sunk to…

North Harris County Regional Water Authority Project 28G proposed 84-inch Water Line Along Gessner Road From SH 249 Regional Pump Station to Greens Bayou
As part of the North Harris County Regional Water Authority’s Project 28 G, Stiver Engineering worked with the client to prepare trench safety plans for the installation of the proposed…
